MENDING THE MAMMOTH'S OLD BONES
After three exciting and productive years at the heavy timber and old red brick
building, activity and development of The MAMMOTH came to a halt. The Fire Marshall
and the City shut down operations due to structural damage to several dozen basement
wood columns. Now we need your help. Chek out our Fundraising Video and visit our
Fundraising Page on GoFundMe.com

All three floors and the basement have been inspected /assessed by Structural Engineer,
Ron Peron. He has prepared a full 6-page four-floor plan for all repairs required to
bring the building up to code.

    Previous 6 photographs by Ruth Meers